Detailed Answer
Answer (C) is correct. Full-cost price is the price usually set by an absorption-costing calculation and includes materials, labor, and a full allocation of manufacturing O/H. This full-cost price may lead to dysfunctional behavior by the supplying and receiving divisions, e.g., purchasing from outside sources at a slightly lower price that is substantially above the variable costs of internal production.