Detailed Answer
Answer (A) is correct.
The variable overhead efficiency variance equals the product of the
variable overhead application rate and the difference between the
standard input for the actual output and the actual input. Hence, the
variance will be zero if variable overhead is applied on the basis of units
of output because the difference between actual and standard input cannot be recognized.