Production and Operations Management Paper 14

1

__________________ calculates the timing and quantities of material orders needed to support the master schedule.






2

Which of the following lot-sizing techniques is likely to prove the most complex to use?






3

__________________ is a time phased approach to managing the physical distribution environment with dependent demand logic.






4

The list of quantities of components, ingredients, and materials required to produce a product is the






5

When a bill-of-materials is used in order to assign an artificial parent to a bill-of-materials, it is usually called a






6

__________________ can be seen as the amount of new inventory created by production.






7

A lot-sizing technique that generates exactly what was required to meet the plan is






8

The operations manager has several tools available to deal with MRP system nervousness. Those tools are






9

__________________ is the amount of materials necessary to support production of the required output in the next higher level in the bill of materials.






10

Breaking up the order and running part of it ahead of schedule is known as