Two major components of fitness of use are Quality of Design and ______________.
Detailed Answer
A
2
For new product development, the chosen methodology should be
Detailed Answer
A
3
In DMAIC, redesigning of process to either remove bottlenecks or to reduce waste takes place in the ______________ stage.
Detailed Answer
C
4
The critical path method determines the ______________ path from the beginning to the end of the project.
Detailed Answer
C
5
The Operating characteristic curve shows the relationship between the probability of acceptance (on y axis) and ______________ (on x axis).
Detailed Answer
A
6
In a double sampling plan, let d1 be the number of defects in the first sample and d2 be the number of defects in the second sample. Let c2 be the acceptance number for both samples. The condition for rejection is:
7
While random variability in a system can be removed by ______________, non-random variability requires ______________.
Operator or management action, Improvement in the system
Improvement in the system, operator or management action
Detailed Answer
Detailed Answer
B
Statistical Quality Control, Quality Checks
None of the above
8
The concept of rational sub group means that subgroups or samples be selected such that if assignable causes are present the chances for differences between subgroups will be ______________.
minimized
maximized
Detailed Answer
Detailed Answer
B
neutralized
optimized
9
Q-Q plot is used to check:/p>
Normality of the dataset
Detailed Answer
Detailed Answer
A
Number of defects
Process mean
Process standard deviation
10
The OC curve provides a measure of the ______________ of the control chart.