Total Quality Management Paper 39

1

You are sampling items from a batch and plotting the results on a control chart. how will an increase in the number of items sample affect the value of the standard deviation used to set the control limit?






2

From a high level perspective, quality:






3

The project management team for quality should:






4

From the project manager viewpoint, quality assurance involves:






5

The quality management tool that can be described as "a diagram that rank and displays defects in order of frequency of occurrence (from left to right)" is a:






6

The ISO 9000 series is:






7

Quality control is the technical processes that ______________ the project progress against the performance standards.






8

When data is plotted on the control charts, the data is of two types: R and -bar. The R data represent points of a ______________ while the X-bar data represent points of a(n) ______________.






9

A quality program within a project should be based on ______________ of errors to improve productivity along with quality levels.






10

Trend charts reflect the relative status of a program. Trend charts are effective means of ______________.






Result

Total Questions:
Correct Answers:
Wrong Answers:
Percentage: