Total Quality Management Paper 46

1

In the area of quality, project managers are struggling with the training and indoctrination of individuals in the need to do the work right the first time to conform to the requirement. Occasionally, the project manager will discover an individual, either in the planning or actual work, doing more than is called for in the specification. These individuals need training to reduce the level of "over building" because ______________.






2

Which of the following models value stability?






3

Reworking ______________ the cost of quality.





4

Which of the following document(s) is (are) included in the quality system?






5

The overall intentions and direction of an organization with regard to quality as formally expressed by top management is a:






6

Which of the following is not considered a cost of nonconformance to quality?






7

The same quality control manager decides to increase his daily sample size from three to six. The size of the control band will:






8

An acceptance control chart has limits that are based on the specification limits for the product rather than limits which differentiate between random and assignable causes. Under which if the following circumstance should a QC manager consider using an acceptance control chart?






9

Cost of quality is a concept that includes:






10

Quality management includes forming and directing a team of people to achieve a qualitative goal within an effective cost and time frame that results in:






Result

Total Questions:
Correct Answers:
Wrong Answers:
Percentage: