The pattern of continuous movement in one direction in a control chart is termed as:
Detailed Answer
C
5
Juran quality management philosophy is based on three pillars namely planning, control and ______________.
Detailed Answer
B
6
For a point in the control chart to be out of control, it must lie
Detailed Answer
A
7
X bar should never be interpreted when:
Detailed Answer
A
8
The average run length can be defined as:
Detailed Answer
B
9
Consider the first method of p bar estimation where each sample is of varying size. If the 3rd sample has p bar =.01, and the sample size of the 3rd sample is 10, what will be the upper control limit for the 3rd sample?
Detailed Answer
B
10
A major assumption for p chart is that all units produced are ______________.