Correct answer: (C) actions to provide confidence of satisfying quality requirements
Correct answer: (A) Design
Correct answer: (A) identifying which quality standards are relevant to the project and determining how to satisfy them
Correct answer: (A) increased productivity, increased costeffectiveness, and decreased cost risk
Correct answer: (C) conforming to the requirements specifications
Correct answer: (D) identifying patterns of variance using control charts
Correct answer: (D) A and C
Correct answer: (C) engineering
Correct answer: (B) philosophy, assurance, and control
Correct answer: (D) all of the above
Total Questions: | |
Correct Answers: | |
Wrong Answers: | |
Percentage: |
|