?

Clay Co has considerable excess manufacturing capacity A special job order’s cost sheet includes the following applied manufacturing overhead costs:

Fixed costs $21,000

Variable costs 33,000

The fixed costs include a normal $3,700 allocation for in-house design costs, although no in-house design will be done. Instead, the job will require the use of external designers costing $7,750. What is the total amount to be included in the calculation to determine the minimum acceptable price for the job?